Poultry processing enterprise, financed by “Sapard” program.
Refrigeration installations:
- Freezing tunnel: t= -30°C, capacity: 500 kg/ 12 hours
- 10 cold stores: 4 low-temperature, t = -18°С and 6 with t= ±0°C; total volume: 430 m3
Electrical plants:
- Lightning installations for production and public buildings
- Driving installation
- Lightning-conductive and earthing installation
- Telephone installation
Heating and ventilation:
- Heating and ventilation of production and public buildings
Monitoring system